To Study and provide engineering solutions of the existing smoke extraction system with minimum changes in the ongoing construction.
The Fire zoning was studied as per IBC 2012 and NFPA and the Fire curtains were provided to restrict the atrium openings to two levels as per the site conditions to counterfeit the requirement of the smoke extraction system.